Enquiry Telephone Number: 01663 761 493

accreditations

 
mtx contracts mtx contracts

Bristol Fruit Sales

Installation of four state of the art Banana Ripening Rooms
Completion December 2005

We have recently completed the installation of 4 No 36 tonne Pressurised Ripening Rooms. This was an extension to the clients current facility that already houses thirty 24 tonne Ripening Rooms previously installed in addition to a two storey temperature controlled packing facility and large store.

The rooms were constructed using 100mm thick insulated PIR composite panel. Within each of the rooms we have a complex steelwork arrangement which acts as pallet support.

Full design and installation including mechanical, electrical and refrigeration was carried out in house. Cooling to the rooms was provided by a series of DX packaged condensing units provided by Airedale.

A sophisticated control system was installed offering accurate temperature control.

The timely completion of the project was vitally important as this was key to the clients operational requirements.

View more mtx case studies



RipeningRooms.com. A specialist website highlighting the benefits of the mtx fruit ripening system.


For further information on our fruit and banana ripening rooms, visit www.RipeningRooms.com.
Case studies, technical specifications and an interactive Ripening Room!



 

 

DESIGN & BUILD • OPERATING THEATRE SUITES • SERVICE & MAINTENANCE