Skip to main content

Traditional Construction

At MTX we can offer a complete turn-key delivery solution for traditionally constructed buildings. Our primary delivery strategy drives off-site engineering and manufacture.

Our turn-key solution is proven to have many advantages.  We constantly challenge traditional and accepted ways of working and push the boundaries of design for manufacture.  Collaborative working is at the core of every project which ensures that we collectively drive success.

We aim to deliver patient focused environments that:

  • Achieve new levels of off-site manufacture
  • Improve building quality
  • Reduce disruption
  • Deliver optimal programme periods
  • Decrease waste
  • Reduce environmental impact

Furthermore, the use of off-site engineering and manufacture helps the individual project teams to achieve:

  • Optimised programme sequences and periods
  • A high level of building and engineering services constructed off-site
  • Significant reductions in programmes
  • A reduction of labour on site
  • Significantly reduced number of transport movements
  • Inconvenience to hospital users and neighbours is minimised

Our proposition can include the complete architectural and services design followed by the complete fit out including the supply of specialist medical equipment should this be preferred. Our enviable off-site experience enables us to accommodate our clients exact requirements ensure each and every project we are involved in delivers a patient focused accommodation with longevity.

Case Study

Manchester Royal Infirmary

46 Bed Head & Neck Surgical Unit and Vascular Centre
MTX were awarded the contract to redevelop an existing ENT department in to a new 46 Bed Head & Neck Surgical Unit and Vascular Centre at the Manchester Royal Infirmary.