MTX have been appointed to provide Hereford County Hospital with a 3 storey modular building with top floor plantroom, to provide a 72 new beds within three 24 bed wards.
The new facility, which will open early 2021, will link into the existing hospital at ground floor. It will house multi-function bed bays alongside single bed accommodation and ancillary areas.
Site establishment has been achieved and the groundworks have commenced alongside the installation of the main drain runs for the scheme.