“MTX have recently completed a state-of-the-art PET / MR Scanner Suite on a design and build contract for their client; Engie Buildings Limited at the Central Manchester University Hospital Trust for studies in to dementia. Their pre-construction team provided design leadership from the outset and a proactive attitude toward solving difficult technical problems which included the use of an electrically powered robotic pecker inside the building to break out an existing ground floor slab in a live Hospital environment. The project was managed diligently throughout the construction phase, with strong relationships built between all of the stakeholders involved. This created a positive atmosphere teamwork approach to the project and has resulted in its successful completion, with the expectations of the users being exceeded.”