Winner of Offsite Awards Healthcare Project of the Year, this 3 storey ward development was completed in just 1 year thanks to Modern Methods of Construction (MMC).
MTX delivered 98 bed spaces across 3 wards and ensured a seamless connection into the existing ward block, via linkway corridors.
Read the full case study here: www.mtxcontracts.co.uk/norfolk-norwich-university-hospital-ward-development/