Working directly for the Trust and adopting volumetric construction, we provided a high specification facility in addition to remodelling and refurbishment of an existing department.
Read more in the story featured in todays Manchester Evening News: http://www.manchestereveningnews.co.uk/business/mtx-contracts-on-the-move-11117587
On July 13th 2015, MTX were successfully awarded the contract to design and build a 16 bed Modular Adult Care Ward for the Wye Valley NHS Trust at Hereford County Hospital with a contract value of (approx.) £1.782 million.
Working in conjunction with Engie and on behalf of the Trust, we provided a new scanning department which included all critical MEP services. The building was construction from LSF and traditional brick.
In December 2015 MTX were awarded a contract at Blackpool Teaching Hospital to provide an additional operating theatre.
MTX have recently be awarded the contract at New Hall Hospital in Salisbury, for Ramsay Healthcare; to provide a new modular extension linking onto an existing ward & theatre suite which are to be remodelled as part of our works.
MTX have been awarded to contract to provide a new modular Clinical Administration Building at the Royal Sussex County Hospital.
In August 2015 MTX were awarded a project at Yeovil District Hospital to provide a new modular 24 bed ward extension to be sited above the existing Level 3 at Yeovil District Hospital.
In August 2015 MTX were awarded the contract from Care UK for the Design, Supply and Installation of a two storey Modular Building at Barlborough Treatment Centre in Chesterfield.
MTX have recently been awarded the contract to deliver a twin operating theatre suite complete with a 4 bed first stage and two 8 bed second stage recoveries at Luton and Dunstable Hospital for LDH NHS Foundation Trust.